Industrial BuildingSino-US joint venture

BAC Dalian New Factory & Asia-Pacific Laboratory

A Sino-US joint-venture refrigeration equipment factory and Asia-Pacific lab in Dalian, delivered to LEED Gold and FM certification with full-discipline BIM.

BAC Dalian New Factory & Asia-Pacific Laboratory
Location
Lüshun, Dalian, Liaoning, China
Client
BAC Dalian Co., Ltd. (Sino-US joint venture)
Scale
Site 62,703 m² · GFA 39,524 m²

Disciplines delivered

ArchitectureStructuralMEP / HVACLandscapeInteriorBIMLEED consultancy

Key highlights

  • LEED Gold + FM certified
  • >90% prefabricated materials
  • Rooftop distributed PV
  • Full-discipline BIM incl. finishes
  • One-stop service to property certificate

Overview

BAC Dalian (registered 1997) develops evaporative condensers, ice-storage air-conditioning equipment and closed-circuit cooling towers. This greenfield new factory and Asia-Pacific laboratory consolidates its R&D and manufacturing on a single Lüshun site, designed to demanding US-investor certification standards.

Scope

  • Planning site area: 62,703.44 m²
  • Total gross floor area: 39,524.45 m² (office 9,724 m², training 2,955 m²)
  • Structure: reinforced-concrete frame + portal steel frames, 15 m eave height
  • Full scope: architecture, landscape, interior, FM (factory mutual) design and LEED design

Key technical highlights

  • Green / prefabrication: a showcase for new-energy and new-material application — over 90% of the building uses prefabricated new materials, with rooftop distributed photovoltaics for energy sustainability.
  • Full-discipline BIM: complete digital BIM across all disciplines including finishes, improving design quality and supporting full-lifecycle management.
  • Structural system: multi-story blocks use a 3D steel frame; single-story blocks use light-gauge steel with foamed concrete and a 10.5 m large-bay portal frame.
  • MEP optimization: the HVAC scheme uses water-source VRF combined with a closed-circuit cooling tower — water as the heat-exchange medium gives higher efficiency than air-cooled systems while retaining VRF flexibility and high part-load efficiency, controlling investment cost.
  • One-stop delivery: from concept through construction drawings, the team handled the full permitting process until the owner obtained the property certificate.

Standards & references

LEED (Gold target), FM approval, Chinese building/structural/fire codes.

Engineering tools for preliminary design

Discuss a similar project

Tell us about your facility scope, location and standards — our team responds within one business day, in China or internationally.

Request an assessment