Chemical & Pharmaceutical DesignIndustrial park

Dalian Songmu Island Chemical Industry Development Zone

Comprehensive utility, process and environmental design for a chemical industry park on Songmu Island, including high-voltage screw-glycol refrigeration and complex multi-product wastewater/exhaust treatment.

Dalian Songmu Island Chemical Industry Development Zone
Location
Songmu Island, Dalian, Liaoning, China
Client
Chemical industry park developer
Scale
Multi-plant chemical park

Disciplines delivered

Process engineeringUtilities (heating / raw-material transfer)HVACWastewater & exhaust treatmentPiping

Key highlights

  • 10 kV high-voltage screw-glycol chiller + evaporative condenser
  • Closed-circuit system removes cooling-water loop and pump
  • Remote-metered raw-material tank farm with combustible-gas detection
  • Complex multi-product wastewater/exhaust treatment

Overview

The Songmu Island chemical industry development zone required integrated design of all shared utilities and environmental systems serving its many chemical plants — process cooling, heating, raw-material transfer, and wastewater/exhaust treatment — coordinated across a long, heavily piped site.

Scope

  • Park-wide utilities, heating, raw-material transfer, and waste (water/gas) treatment
  • Long-distance outdoor piping to every process unit with remote metering and parameter monitoring

Key technical highlights

  • HVAC / refrigeration: the process chilling system uses a screw glycol chiller paired with an evaporative condenser. Compared with a conventional bare-tube condenser + open tower + cooling-circulation-pump arrangement, it eliminates the cooling-water system and circulation pump; the closed-circuit tower has a small pump head, materially cutting operating cost. It runs on 10 kV high-voltage supply, lowering total investment and line losses.
  • Raw-material tank farm: many material types, each tank with remote monitoring, and the tank farm equipped with combustible-gas detection alarms; transfer has remote + local control and metering, making pipe routing highly complex.
  • Stormwater interface: the provided municipal stormwater connection point was too high to discharge by gravity; after several rounds of coordination and site survey the intake was relocated externally.
  • Wastewater / exhaust: the many plant products produce complex, fluctuating waste streams requiring stringent, high-difficulty treatment.

Standards & references

Chinese chemical-plant design and environmental-protection codes.

Engineering tools for preliminary design

Discuss a similar project

Tell us about your facility scope, location and standards — our team responds within one business day, in China or internationally.

Request an assessment